Image Alt

Resource Optimisation

Strategy based on market and resource knowledge

How do you ensure that the new quarry (or extension) that you are planning is designed to maximise the NPV return on your investment?

Better still, how do you strategically plan multiple quarries, all in different stages of their lifecycle to maximise their NPV based on changing market conditions?

Quarry resource optimisation – single quarry

Determining the most economic pit is not something you should leave to chance or guess at and should be part of any quarry feasibility study. This is especially important when you are submitting a design to a regulator and are going to be held to that design – you want it to be right the first time!

We have the tools to optimise the pit design and stages based on geological, operational, financial and market parameters. These factors are used to evaluate millions of different options and ensure that effective sensitivity analysis has been conducted.

Network resource optimisation – multiple quarries

We use state of the art software that is simple to interpret, provides an optimisation of each resource within a cluster and can then schedule all of them simultaneously to determine the best outcomes against changing variables of cost and market.

Best of all, this approach provides the tactical inputs to actual site planning to ensure that strategic plans become a tactical reality.

Want to know more about the theory of resource optimisation?

We regularly see pit designs that have been submitted to regulators that are operationally difficult (and in some cases impossible to achieve) and have not been optimised to ensure maximum NPV. 

Don’t settle for 2D drawings of pit designs or designs that have not been optimised.

RESOURCE OPTIMISATION

Services we offer

  • Multi pit optimisation
  • Staging plans
  • Single pit optimisation

PROJECTS